Fix-and-Flip Action Checklist: What to Include

Fix-and-Flip Action Checklist: What to Include

What should be included in a fix and flip action checklist?

A strong fix and flip action checklist should cover the full rehab lifecycle—from acquisition through resale—so nothing critical slips between contractors, permits, inspections, and marketing. The best checklists are organized by phase, clearly assign ownership, and include “gate” decisions (what must be completed before moving forward).

1) Deal setup and due diligence

Start with the fundamentals: property details, ARV assumptions, scope notes from the walkthrough, photos, and a preliminary budget with contingency. Include financing terms, holding-cost estimates, and a timeline target. If a step impacts your go/no-go decision (like foundation concerns or comps changing), put it here with a clear trigger to reassess.

2) Scope of work and budget controls

List every task by trade (demo, framing, plumbing, electrical, HVAC, roofing, windows, drywall, paint, flooring, cabinets, countertops, landscaping, cleaning). For each item, include material selections, quantities, and quality standards (e.g., paint sheen, flooring type, fixture finish). Add a change-order process so upgrades and surprises are documented, priced, and approved before work begins.

3) Permits, inspections, and compliance

Include permit requirements, application dates, and inspection checkpoints (rough-in, insulation, final). Add utility coordination (power, water, gas) and safety items like lead/asbestos procedures when applicable. Missing a single inspection can delay closing, so make inspection scheduling a dedicated line item—not an afterthought.

4) Contractor coordination and weekly execution

Build in a communication cadence: weekly site walk, progress photos, punch-list updates, and payment milestones tied to completed work (not calendar dates). Track deliveries, backorders, and long-lead items (windows, cabinets, appliances) to prevent downtime.

5) Finalization, listing, and sale

Include cleaning, staging decisions, professional photos, lockbox setup, disclosures, warranty documents (if offered), and a pre-list inspection strategy. Add a closing checklist: repairs requested by buyer, appraisal access, final walkthrough preparation, and utilities transfer.

For a detailed, ready-to-use structure that speeds rehabs and reduces missed steps, review the full guide here: fix and flip action checklist.

FAQ

How do you keep a fix-and-flip rehab on schedule?

Set phase deadlines, schedule inspections early, and track long-lead materials before demo begins. Hold a weekly walkthrough with an updated punch list and tie payments to completed milestones.